Offshore drilling performance improvement with tde empower



HOURS DRILLING TIME SAVED
hours saved in the 17-1/2” section
hours saved in the 12-1/4” Section
hours saved in the 8-1/2” section

tde empower service realises significant performance improvements in challenging offshore drilling application

tde empower provided support to a multinational oil company over a challenging two well offshore campaign in the far east. The tde empower engineers used tde pronova to establish benchmarks, performance trends and KPI baselines. tde-trace was then used to analyse drilling practices and procedures and tde-prognose was used to identify hydraulic based performance opportunities.

Offset well analysis using the tde suite of tools identified opportunities in the 17-1/2, 12-1/4 and 8-1/2” sections. Recommendations made during the offset analysis stage were implemented and performance monitored with real-time observations provided to the operator.

Significant performance improvements were achieved on the second well, including several field best metrics. New bit technology recommended by the tde empower engineers was also successfully implemented.

Results/How our tde solution helped the Client

Hole SectionHighlights
17-1/2” Section• Saved 8 hours (normalized) compared with the best field offset performance
• All metrics improved from first tde empower well
• Best on-bottom ROP (by formation and overall)
12-1/4” Section• Fastest average Weight – Weight and Weight – Slip times
• Fastest on bottom and with connection ROP
• Saved 6.7 hours compared with normalized connection times
8-1/2” Section• Fastest average Weight – Weight and Weight – Slip times
• Saved 34 hours (normalized) with fastest on bottom ROP
• Successful trial of new, agile steerable bit technology to achieve build rates.
• Saved 5.5 hours compared with normalized connection times

17-1/2” ROP improvements:

12-1/4” Connection breakdown and ROP performance:

8-1/2” Connection breakdown and ROP performance: